Hospital construction project

Exterior

Exterior

Hospital as a medical referral system chain, have an important role in the implementation of the National Health System. The importance of the role of the hospital is seen in: the role of the hospital as a medical service quality corresponding class hospital. The role of the hospital as a place of health education of all levels ranging from medical, public doctors and specialist doctors, who are ready to spread throughout the national territory. The role of the hospital as a place of research and development of science and technology in medical field that became an important tool in improving the quality of medical services.

In accordance with the development of society, the hospital is also constantly evolving. Many factors have an influence on the development of hospitals in Indonesia. Several important factors and their influence on the development of lay weakly in Indonesia are:

Socioeconomic development of the communities Due to development outcomes that have been achieved by Indonesia, the nation’s socioeconomic conditions gradually improved. The impact of the hospital is the hospital will try to improve the quality of services in all sectors (including preparing for a VIP room).

  1. The development of science and technology in medicine. As a result of the development of science and technology, many hospitals are competing to use sophisticated new equipment, so the cost of medical care becomes increasingly expensive. Another impact of the use of science and technology is a hospital ethics violation, which in the meantime have started to appear.
  2. Disease progression. Disease state in Indonesia at this point in the transition period. That is an infectious disease has declined, but not yet finished. While degenerative diseases, malignant diseases, diseases caused by traffic accidents and work accidents are increasing. As a result, the hospital had to re-composition of the bed and Polyclinic.
  3. Competition among hospitals. With the growing number of hospitals, there will be competition between hospitals increasingly stringent. The impact is that every hospital will improve the management and even the hospital ethics violations. Also due to competition, public hospitals will be expected to develop particular disease specialties.
  4. Changes in government policy. Government policies that directly affect the development of the hospital is there: a. Permit the investors (Domestic – PMA) for weakly engaged laity, making chances of establishing new hospitals with sophisticated equipment. b. Make the government hospital as a self-financing institution. If the policy is well underway, expected quality of government hospitals will be good, so as to compete with private hospitals.

Actual physical work hospital construction project includes earthworks and maturation, building works, mechanical works and electrical, jobs and jobs furniture fixtures and equipment Hospital.

The details of these achievements are as follows:

a. building work consists of:

  1. Structural work: The work structures include preliminary work, earthwork, foundation work, concrete jobs (basement, 1st floor, 2nd floor, 3rd floor, 4th floor (floor roof / engine room), a pump) that achieve 100% (completed) .
  2. Architectural work package, include: work preparation, basement floor work (ceilings, doors and windows, flooring, walls, wall finishing and painting, pitch. Complementary, generator room, ground tank and the pump), work Floor 1 (ceiling, doors and windows, flooring, walls, wall finishing and painting, pitch, supplement, stairs outside), work Floor 2 (ceilings, doors and windows, flooring, walls, wall finishing and painting), work Level 3 (ceiling, doors and windows, flooring, walls, wall finishing and painting), work Floor 4 (roof) (ceiling, doors and windows, flooring, walls, wall finishing and painting) who have achieved the feat of 100% (complete).

b. Electrical work package, include:

  • Work site plan (power panel, feeder cables, earthing cables, installation of lighting, sound installation)
  • Basement floor work (power panel, feeder cables, earthing cables, installation of lighting, telephone installation, sound installation, fire alarm installation, data installation, MATV, cable tray)
  • Work first floor (power panel, feeder cables, earthling cables, installation of lighting, telephone installation, sound installation, fire alarm installation, installation data, MATV installations, installation of nurse call, cable tray and cable ladder)
  • Work second floor (power panel, feeder cables, earthling cables, installation of lighting, telephone installation, sound installation, fire alarm installation, installation data, MATV installations, installation of nurse call, cable tray)
  •  Work on the third floor (power panel, feeder cables, earthling cables, installation of lighting, telephone installation, sound installation, fire alarm installation)
  • Accumulated Achievement work already includes mechanical and electrical, which has reached 100% achievement (completed).

c. Mechanical work package, include:

  • Work Aviation (basement, 1st floor, 2nd floor, 3rd floor, 4th floor (roof))
  • Work Plumbing (basement floor, pump room, parking and utility area, outside of the building, 1st floor, 2nd floor, 3rd floor, 4th floor (roof))
  • Fire Works (hydrant system, pump room, outside the building, the basement floor, 1st floor, 2nd floor, 3rd floor, 4th floor (roof))
  • Work medical gas and suction vacuum (major appliances)
  • Work in the house transportation (supply and installation of elevators
  • Accumulated achievement work already includes mechanical and electrical, which has reached 100% achievement (completed).